EOSby AssetShop
Skip to main content

Industry examples

EOS IN FOUR INDUSTRIES

Four illustrative films show the same pattern in four very different settings: sources that disagree are connected, reconciled and kept as evidence, and a person decides. Each film runs on a synthetic tenant. The figures are examples, not live data, and no customer is shown.

Read this first. The films show what EOS does with the sources once they are in: identity, reconciliation, evidence, scenarios and recommendations that a person authorizes. The tables below say what reaches EOS today, and where there is no connector, that is stated. Industry-specific modules such as a scarcity ledger, crop timing and price scenarios, or end-of-life tracking for materials are shown as intended use and are not shipped as separate products. Built means in the live service and tested against the published format; conformed means in the live service, tested through a fake transport or on events written to the published shape, and not yet run on a live publisher or a partner's data. For what runs in the live service, see Integrations.

Automotive manufacturing

One vehicle program, eight systems that disagree, and a tier-2 constraint traced to the vehicles it touches before the line stops.

Sources in the film, and how each reaches EOS today

SourceWhat it tells youHow it reaches EOS today
Product lifecycle (PLM)design intentSpreadsheet template or warehouse SELECT. No native PLM connector.
Engineering BOMwhat the car should containSpreadsheet template or warehouse SELECT.
ERPorders, costs, inventoryThrough EDI, spreadsheet templates or a warehouse today.
Supplier portalswhat suppliers say they shipX12 850, 856 and 810; EDIFACT ORDERS, DESADV and INVOIC (built).
Plant execution (MES)what the line actually builtOperational-system push (ISA-95 production performance) through the registered system gateway (built), or the factory spreadsheet template.
Logistics and ASNswhat is in transitX12 856 and EDIFACT DESADV (built); GS1 EPCIS shipment events (conformed).
Quality and warrantywhat came back wrongSpreadsheet template or warehouse SELECT.
Planning and schedulingwhat the plan assumesSpreadsheet template or warehouse SELECT.

Critical minerals

Three ledgers with three tonnages, a lot that cannot prove where it came from, and scarcity managed as an input instead of a surprise.

Sources in the film, and how each reaches EOS today

SourceWhat it tells youHow it reaches EOS today
Warehouse countwhat the yard says is on handSpreadsheet template or warehouse SELECT.
Consignment recordwhat a supplier says it holds for youSpreadsheet template; EDI where the supplier sends it.
Finance ledgerwhat the books carrySpreadsheet template, ISO 20022 camt.053 for bank balances, or warehouse SELECT.
Lot provenance and certificateswhere each lot came fromCustody events as GS1 EPCIS (conformed); certificates attached as evidence. No registry or assay-lab connector.
Shipments and customswhat is moving and clearedX12 856 and EDIFACT DESADV (built); GS1 EPCIS events (conformed). No customs-system connector.

Food commercial networks

Shopper, kitchen, market and field signals read together to time and price a crop, plan the harvest, and track materials such as PLA through to their end of life.

Sources in the film, and how each reaches EOS today

SourceWhat it tells youHow it reaches EOS today
Retail point of salewhat shoppers bought todayPoint-of-sale transactions and returns through the operational-system push (built), the point-of-sale spreadsheet template (built), or a warehouse SELECT (conformed).
Commodity priceswhat the market paysSeries you name, through FRED with your own FRED key (conformed in the live service, not yet run against the live publisher). Not every commodity has a FRED series; others arrive by template or warehouse.
Foodservice orderswhat kitchens will needX12 850 and EDIFACT ORDERS (built).
Cold chain and logisticswhat is moving, how coldTemperature from your own sensors through a signed edge gateway (built); GS1 EPCIS events with temperature readings and their unit (conformed); shipment notices by X12 856 and EDIFACT DESADV (built). Telematics: Samsara and Geotab readers set odometer readings on vehicles already recorded (conformed).
Weather and soilwhat the field will doObserved weather from the nearest National Weather Service station, and the USDA NRCS soil survey for a point, both United States only (conformed). Forecasts are not recorded as observations. A soil survey is a published map unit, not a measurement of your field.
Field and yield recordswhat is ripening whereUSDA NASS Quick Stats for national and state crop progress, area, yield and production with your own key (conformed). Your own farm's field, crop, season, area and yield arrive through the field-yield spreadsheet template (built) or a warehouse SELECT; no farm-management-system connector.
Packaging specificationswhat each pack is made ofSpreadsheet template. No specification-system connector.
Waste and recoverywhere materials end upSpreadsheet template. No recovery-network connector.

Air traffic monitoring

A synthetic airspace where radar, ADS-B and filed plans disagree, one conflict is predicted with its options modeled, and a controller decides. EOS supports monitoring and decision support. It does not direct aircraft, and it is not certified for operational air traffic control.

Sources in the film, and how each reaches EOS today

SourceWhat it tells youHow it reaches EOS today
Surveillance radarposition and range from the sweepNo native radar connector. Through the registered operational-system push or a warehouse SELECT, where your air navigation provider releases a feed to you.
ADS-B receiverswhat each aircraft reports for itselfNo native receiver connector. Through the operational-system push or a warehouse SELECT.
Flight plan processingwhat was filed and clearedSpreadsheet template or warehouse SELECT. No native flight data connector.
Weatherradar, forecasts and advisoriesObserved weather from the nearest National Weather Service station, United States only (conformed). Other weather feeds through the operational-system push.
Notices and airport operationsclosures, restrictions, runways and slotsSpreadsheet template or warehouse SELECT. No native connector.
Limits. The scenario is synthetic and its callsigns are fictional. Instructions to aircraft go out on the customer's own certified systems. EOS is decision support beside them, never in place of them.

Related: Optimize, Fleet, Industrial, Critical minerals, Reconciliation, Integrations.

Request the two-week EOS assessment: $15,000, read-only, first finding targeted in 14 daysRead-only throughout. If you continue to the $50,000 pilot, the $15,000 assessment fee is credited.