AssetShop Enterprise OSSTATIC RENDER · NO SCRIPTS · SYNTHETIC DATASET

STATIC PAGE Interactive levers, live recompute, and Record decision run in the app build; every figure, formula, evidence row, and WHY below is the real render, pre-computed. Evidence panels are opened for review.

Guided Walkthrough (Platform Demo) Synthetic tenant. Every figure MODELED, every record SYNTHETIC, no production system connected. The commercial platform is a separate authenticated environment scoped to your organization for your agreed term. Commercial sign in
Tenant-One Industrials · Cost Engineering

Should-cost, part strategy, NPD

Viewing as CFO: deterministic Monte Carlo at 2000 runs per SKU, part strategy from real spend and coverage, NPD-7788 at concept against its basis distribution.

PeriodFull year As of2026-07-01T06:14Z · seed BasisSYNTHETIC DATASET ScopeGlobal rollup
Part strategyFROM SPEND AND COVERAGE
StrategicGC-4471 · Vendor-Alpha Forging$2,999,360.00 · cov 72%
LeverageMP-5120 · Pacific Plastics$2,746,640.00 · cov 91%
BottleneckOF-2210 · Eastern Components$2,401,880.00 · cov 64%
Cost engineering rule pack2 fired
warnGC-4471 actual 41.20 sits above the p75 should-cost 40.47SHOULD_COST_GAP

Deterministic Monte Carlo, 2000 runs; the gap points the same direction as the PPV finding and gives the negotiation a defensible number.

warnNPD-7788 target 34.50 sits below the basis p50 39.79NPD_TARGET_TIGHT

Design-to-cost has to earn the gap; flag it at concept, not at launch.

holdingThe Monte Carlo is seeded and reproducibleMC_DETERMINISM

2000 runs per SKU, identical on every evaluation; the suite asserts it.

holdingEvery cube line carries a strategy quadrantQUADRANT_COVERAGE

Classified from real spend and contract coverage.

Should-cost tableSEEDED · 2000 RUNS
Columns
Saved views:
Should-cost table: filtered view exports through Copy, CSV, Excel, and PNG.
GC-447139.8039.7940.4741.20
MP-512014.3014.2814.5413.90
OF-221073.1073.1074.3074.50

Saved views persist per user in tenant mode; this session keeps them in memory. Exports serialize the filtered view. 3 of 3 rows shown.

NPD-7788 Compact housing, next gen: target 34.50 against the GC-4471 distribution; the tight target fires at concept, where it is cheap to hear.

Finished-Good Cost ProjectionCOMPONENT-LEVEL · DRIVER-MAPPED

MODELED on a SYNTHETIC driver path, 2026-09-01 to 2027-02-01: finished-good cost moves +3.84% over 6 months, $2,715.66 to $2,820.05, and every month shows which driver moved which component.

MonthComponentsDutyFreightFinished good
2026-09$2,500.00$95.66$120.00$2,715.66
2026-10$2,526.26$96.61$122.40$2,745.27
2026-11$2,554.58$97.63$125.40$2,777.61
2026-12$2,548.76$97.48$128.40$2,774.64
2027-01$2,579.72$98.64$127.44$2,805.80
2027-02$2,594.72$99.21$126.12$2,820.05

Should-cost on the PSU, SYNTHETIC: quoted $620.00 against a built-from-physics $554.40, gap $65.60. should 55440 = material 31000 + process 14000 + overhead 5400 (12% of base) + margin 5040 (10%); gap 6560 = quoted 62000 minus should

AlternativeCostCradle CO2eSustainableNote
GaN-stage supply, HS 8504$657.20 (+6%)42.9 kg (-22%)YEShigher efficiency cuts lifetime energy; qualification cycle applies
Second-source, same spec$595.20 (-4%)55.0 kg (0%)noprice leverage only; dual-source resilience gain